Plans for new UNH pool delayed by poor soil

bug


We also have more stories about:
(click the phrases to see a list)

Places:

 


DURHAM, New Hampshire — The discovery of poor soil has delayed the planned opening of a new outdoor pool at the University of New Hampshire until 2016, a year later than expected.

Foster's Daily Democrat reports (http://bit.ly/1sFE39N) UNH spokeswoman Erika Mantz says a recent study determined that soil in the area was very poor for building the pool, requiring additional work before construction can begin.

Mantz said UNH remains committed to the existing site for the pool. The delay also will not affect the size of the pool or design elements.

UNH closed its historic 42,000-square-foot pool this summer due to health and safety concerns. A new pool was approved in April.


Information from: Foster's Daily Democrat, http://www.fosters.com

All content copyright ©2014 Daily Journal, a division of Home News Enterprises unless otherwise noted.
All rights reserved. Click here to read our privacy policy.